The agency

 

A project is constantly in motion: construction, renovation, transformation, demolition... It only stops evolving when you stop believing in it. Aware of this fact, Betic adopts an innovative approach, often on the bangs of conventional technical solutions.

 

Preferring the "how" to the "why", the office's aim is to produce a project that is adapted to needs, to unite the project management team and to delight the user.

Betic is above all a team that shares a set of values:

  • innovation at the customer's service: a no-holds-barred approach in which every constraint is seen as an opportunity to innovate,
  • uniqueness: each project is unique and must be treated as such.
  • finality: a completed project is one in which the end-user has taken full possession of the building, without holding back.

 

The office supports its customers in all aspects of TECHNICAL ENGINEERING (HVAC “heating, ventilation, air conditioning, sanitary installations, electricity, regulation, etc.) and ADVANCED ENGINEERING (sustainable design, acoustics and vibration, fire safety, façade expertise, Commodo-Incommodo, certifications, etc.).

 

Two strategic turning points have marked the life of the company. The first in 2020, when the office joined the Group VK architects+engineers, strengthening its expertise in its core business and enabling it to offer complementary expertise to its customers.

 

The second in 2023, when the Group Sweco Group, Europe's largest engineering consultancy, acquired VK architects+engineers. As an integral part of the Sweco Group, Betic Engineering now boasts an international team of experts in addition to its local team, enabling it to further consolidate its position in the Luxembourg market by offering its customers an ever more advanced service.

MISSIONS and activities

 

As an engineering consultancy, Betic provides design, monitoring and acceptance of all building technical installations.

 

During the design phase, the team carries out thermal and electrical simulations to help the client and other parties make the right choices.

 

During the authorization phase, the team prepares the necessary applications and studies for environmental certification.

 

During the construction phase, our engineers support the installation companies, ensuring that the work carried out meets the client's expectations.

 

Once the work has been completed, the office devotes the time and energy required to support future users in the appropriation of their new living or working space. It also analyzes and optimizes the building's key parameters to ensure that comfort and energy consumption criteria are constantly being improved.

  • 2000Creation date
  • 105People
  • 3150Projects

our projects

The selection of projects presented here reflects the diversity of our abilities and our capacity to really bring out the character and special features of certain structures. Our expertise has been gained during major projects of varying complexity, which have earned us the trust and confidence of numerous clients.

Rescue and leisure center

Lultzhausen

Capelli Towers

Esch Belval | Luxembourg

Technical school for healthcare professions

Ettelbruck | Luxembourg

Administrative building Deloitte

Cloche d'Or | Luxembourg

World headquarters Casa Ferrero

Niederanven | Luxembourg

BIODIVERSUM NATURE RESERVE VISITOR CENTRE

Remerschen │ Luxembourg

School

Cents | Luxembourg

Administrative building in Route de Trèves

Luxembourg | Luxembourg

Transition centre

Schifflange | Luxembourg

Weidert – 3 to 7 Rue Schiller

Luxembourg | Luxembourg

Heating and cooling system for the Ceratizit factory

Mamer | Luxembourg

Water treatment plant

Grumelscheid | Luxembourg

Shopping centre extension

Massen | Luxembourg

ISL

Luxembourg | Luxembourg

Maintenance hall and secure road center

Bettembourg | Luxembourg

Arboria shopping

Differdange | Luxembourg

Lënster Lycée International School

Junglinster

Les ‘Terrasses’

Differdange

Courthouse

Diekirch

Multi-purpose children's center

Bertrange

Westbay residences

Strassen | Luxembourg

Val Fleuri medical centre

Luxembourg | Luxembourg

The Curve

Luxembourg | Luxembourg

Sofitel and Novotel

Luxembourg | Luxembourg

Porte de Diekirch

Diekirch | Luxembourg

Park Inn by Radisson

Luxembourg | Luxembourg

One on One

Luxembourg | Luxembourg

Maison des Sciences Humaines, University of Luxembourg

Esch-sur-Alzette | Luxembourg

Feiersteppler

Belval | Luxembourg

Reception centre

Steinfort | Luxembourg

Karate dojo

Strassen | Luxembourg

Technical high school

Rédange sur Attert | Luxembourg

Extension to the Kuhn building

Luxembourg | Luxembourg

Water treatment plant

Marnach | Luxembourg

LTAM

Luxembourg | Luxembourg

Conversion of the BEST offices

Senningerberg | Luxembourg

Belval 2 P+R station

Belval | Luxembourg

Transition centre

Garnich | Luxembourg

Lycée PPP

Mersch | Luxembourg

Résidence Grünewald plot 4

Luxembourg | Luxembourg

Lighting for the Parc Wilhelm

Tétange | Luxembourg

Housing complex

Bertrange | Luxembourg

The Résidence du Jazz

Belval | Luxembourg

Pavilion - Restaurant Léa Linster

Kayl | Luxembourg

Police offices

Grevenmacher | Luxembourg

Social housing

Luxembourg | Luxembourg

Railway station

Noertzange | Luxembourg

The Plateau du Funiculaire development

Differdange | Luxembourg

The Human Science Centre in Belval

Belval | Luxembourg

2 – 4 rue Jean l’Aveugle

Luxembourg | Luxembourg

FNEL headquarters

Luxembourg | Luxembourg

Railway station

Esch Belval | Luxembourg

Garden Center

Wemperhardt | Luxembourg

The Bofferding tasting hall

Bascharage | Luxembourg

Projects in Route de Thionville

Bonnevoie | Luxembourg

Résidence La Perle

Merl | Luxembourg

Stock Exchange

Luxembourg | Luxembourg

Footbridge

Esch-sur-Alzette | Luxembourg

The Jongenheem project

Gasperich | Luxembourg

National Health Laboratory

Dudelange | Luxembourg

The Felix Chomé foundation

Luxembourg | Luxembourg

The Biotech building

Belval | Luxembourg

The Omega project

Hamm | Luxembourg

Contact

  • Gilles Christnach
    Gilles Christnach

    Managing Director

    Dippach Office

    • E-mail
    • LinkedIn
  • David Determe
    David Determe

    Managing Director

    Dippach Office

    • E-mail
    • LinkedIn
  • Thierry Collin
    Thierry Collin

    Partner - Team Manager (MEP)

    Wiltz Office

    • LinkedIn
  • Franck Doron
    Franck Doron

    Partner - Team Manager (MEP)

    Dippach Office

    • E-mail
    • LinkedIn
  • Pierre-Yves Guillaume
    Pierre-Yves Guillaume

    Team Manager (MEP)

    Dippach Office

    • LinkedIn
  • Meike Ensch
    Meike Ensch

    Team Manager (MEP)

    Steinheim Office

    • LinkedIn
  • Elise Rein
    Elise Rein

    Team Manager (Advanced Engineering)

    Dippach Office

    • E-mail
    • LinkedIn
  • Sébastien Lehuraux
    Sébastien Lehuraux

    Team Manager (MEP)

    Esch-sur-Alzette Office

    • E-mail
    • LinkedIn
  • Denis Lecanu
    Denis Lecanu

    Communication & Talent Manager

    Dippach Office

    • E-mail
    • LinkedIn
  • Isabelle Snyers
    Isabelle Snyers

    Accounting & Administration Manager

    Dippach Office

    • E-mail
    • LinkedIn

En poursuivant votre navigation sur ce site, vous acceptez l'utilisation de cookies ou d’autres technologies pour le traitement de vos données personnelles afin d'améliorer votre expérience de navigation. En savoir plus